In 2012, Fertoing took part in construction of the first Arctic region LNG shipment terminal near Sabetta township being the part of the big international investment project Yamal SPG (Russian for LNG) based on the Yuzhno-Tambeiskoye gas condensate field resources.

We were among the first to create the geodetic construction base and to get the first geodetic points of the future port. In a short period of time the preliminary bottom survey of port approaches and its future port areas were carried out.

From the very start of dredging operations Fertoing Ltd. provided engineering and hydrographic support. Realizing importance of such work we tried to be precise and thorough at every stage – from planimetric base creation to work scope calculations.