BIG PORT SAINT PETERSBURG

In 2013, Fertoing performed the whole range of its engineering services in the waters of the Big Port St. Petersburg – from construction design to hydrotechnical facilities repair and from aids to navigation supply to bottom survey. Throughout the season, similar services were provided in the seaports of Vyborg, Vysotsk, Ust- Luga, Primorsk, Lomonosov, Kronstadt, St. Petersburg and finished only with ice formation.
 
Particularly noteworthy was navigation and hydrographic support of dredging and land reclamation operations in the territory of the multifunctional marine loading terminal Bronka. These works were carried out on the new survey boat Piranha equipped with modern navigation and hydrographic complex with MBES Kongsberg EM 3002.