Sabetta port facilities construction, including both berthing and dredging facilities, no doubt can be classified as the most complicated engineering operations. Poor transport infrastructure, remoteness from the main supply bases and the Arctic climate contribute to the progress and quality of the project. These conditions require careful planning and ultimate decision-making.

During the season 2013, we provided engineering support to a foreign dredging contractor, designed dredging facilities, carried out diving berth repair works, installed modern port navigational equipment, and participated in creation and maintenance of a united dispatcher service.

Realizing importance and prospects of the goals, Fertoing committed to their safe realization: mobilized modular office system, vehicles, boats, installed base station network, systems of automated hydrological monitoring, and satellite data transmission systems.

Fertoing has proved its worth as a contractor able to cope with complicated engineering tasks and come up with right logistics solutions.

We are confident about the future and know that operations started in 2012 will be long- term and will provide a solid base for meeting our Clients’ new challenges in the future.